New Tower Simulator ANS CR (project NETWOR)
Zadavatel
Řízení letového provozu České republiky, státní podnik (ŘLP ČR, s.p.)
Dodavatel
Podání nabídek
20. února 2026 10:00
Datum zveřejnění
19. listopadu 2025
Popis
Delivery of a new 3D TWR simulator for the Air Navigation Services of the Czech Republic (ANS CR), including Czech Air Navigation Institute (CANI).
The aim of project NETWOR (New Tower Simulator ANS CR) is to provide ANS CR with a highly reliable, flexible, state-of-the-art 3D TWR simulator to fulfill the different training and other needs.
The ANS CR training needs consist of the following types of training:
• initial training (basic and rating trainings),
• unit training (transition and Pre-OJT trainings),
• continuation training (refresher and conversion trainings),
• emergency training,
• OJTI and assessor training,
• military controller training.
These trainings will be performed using several different airport environments:
• LKPR (including stimulated ATM system) - controlled by ANS CR ATCOs,
• LKKV, LKTB, LKMT and possibly LKCS (including emulated ATM system and possibly a Remote Tower system) - controlled by ANS CR ATCOs,
• LKKB, LKPD, LKCV, LKNA - controlled by military controllers,
• artificial airports based on LKPR and LKTB - used for external CANI clients,
• other airports requested by external CANI clients.
The other ANS CR needs include:
• testing of new procedures,
• testing of new ATM systems and system changes,
• testing of airport layout changes,
• airside familiarization for other airport users. Noví dodavatelé 🤏 Zadavatel má pouze 21 % nových dodavatelů
Toto info je pouze po
registrované
uživatele.
The aim of project NETWOR (New Tower Simulator ANS CR) is to provide ANS CR with a highly reliable, flexible, state-of-the-art 3D TWR simulator to fulfill the different training and other needs.
The ANS CR training needs consist of the following types of training:
• initial training (basic and rating trainings),
• unit training (transition and Pre-OJT trainings),
• continuation training (refresher and conversion trainings),
• emergency training,
• OJTI and assessor training,
• military controller training.
These trainings will be performed using several different airport environments:
• LKPR (including stimulated ATM system) - controlled by ANS CR ATCOs,
• LKKV, LKTB, LKMT and possibly LKCS (including emulated ATM system and possibly a Remote Tower system) - controlled by ANS CR ATCOs,
• LKKB, LKPD, LKCV, LKNA - controlled by military controllers,
• artificial airports based on LKPR and LKTB - used for external CANI clients,
• other airports requested by external CANI clients.
The other ANS CR needs include:
• testing of new procedures,
• testing of new ATM systems and system changes,
• testing of airport layout changes,
• airside familiarization for other airport users. Noví dodavatelé 🤏 Zadavatel má pouze 21 % nových dodavatelů
Dřívější dodavatelé
Odkaz na zdroj
Dokumenty
Zaregistrujte se zdarma a využívejte Tendry naplno.